In the fall of 2021, the SMA formed an industry wide task group that included engineers, truss and I-joist manufacturers, builders, hardware manufacturers, railing fabricators, and stairbuilders.  A year later they had successfully changed the International Residential Code (IRC). Their change is now part of the 2024 IRC (full text below) but, it will not be effective until adopted by local jurisdictions.  Most communities have not yet adopted the 2021 version of the IRC.  Therefore, unless we act now, this problem will not be resolved for 5 or more years.

Why Wait? 

The SMA is currently developing resources to aid you in promoting adoption of these important structural changes to floor framing now.  Literature and presentations meant to educate local builders, design and building safety professionals, will be available soon.  Together the building community can emphasize to local building enforcement jurisdictions the need for early adoption to eliminate this structural deficit of the code. You can learn more by contacting your local SMA member

Why Wait? 

The SMA is currently developing resources to aid you in promoting adoption of these important structural changes to floor framing now.  Literature and presentations meant to educate local builders, design and building safety professionals, will be available soon.  Together the building community can emphasize to local building enforcement jurisdictions the need for early adoption to eliminate this structural deficit of the code. You can learn more by contacting your local SMA member

Approved NEW Code for 2024 International Residential Code

Engineering Calculations

Torsion Calculations

Rotation Calculations

Engineering Drawings

Floor Edge Bracing Details – PDF

Floor Edge Bracing Details – DWG

 

Code Change Proposal Archive

Public Comment 1

Original Code Change Proposal

 

IRC: R502.11, R502.11.1, 502.11.2, 502.11.3

Proponents: David Cooper, representing Stairbuilders and Manufacturers Association (coderep@stairways.org); Erik Farrington, representing myself (ewfarrington@sgh.com); Renda Barr, representing Stairbuilders and Manufacturers Association (rbarr@srg-ventures.com); Robert Aulicky, representing Stairbuilders & Manufacturers Association (acitizen@reagan.com); Marvin Strzyzewski, representing Truss Engineering Company (marvins@mii.com); Thomas Zuzik Jr, representing NOMMA (coderep@railingcodes.com); Daniel Obrien, representing Universal Building
Systems, Inc. (dano@stairfasteners.com) requests As Modified by Public Comment

2024 International Residential Code

R502.11 Floor framing supporting guards. The framing at the open edge of a floor supporting a required guard assembly shall be constructed in accordance with Sections R502.11.1 or R502.11.2 for guard assemblies not exceeding 44 inches (1118mm) in height or shall be designed in accordance with accepted engineering practice to support the guard assembly. Where trusses and Ijoists are used as edge framing members supporting guards, except where the effects of the guard loads shall be specifically considered in the design of the edge member.

R502.11.1 Conventional edge framing. Where a roll brace is aligned with each guard post, the framing at the edge of the floor shall consist of a solid or built-up member of lumber, structural glued laminated timber, or structural composite lumber having a minimum net width of 3 inches (76mm) and a minimum net depth of 9-1/4 inches (235 mm) and shall be braced to resist rotation by roll bracing as described in Section R502.11.3 

 

R502.11.2 Timber edge framing. Where a roll brace is not aligned with each guard post, the framing at the edge of the floor shall consist of a minimum 6×10 sawn timber or a minimum 5-1/8 inch x 9-1/4 inch (130 mm x 235 mm) structural glued laminated timber and shall be braced to resist rotation by roll bracing as described in Section R502.11.3 at intervals of 48 inches (1219 mm) or less.

R502.11.3 Roll bracing. Each roll brace shall be a joist or blocking matching the depth of the edge member and extending perpendicular to the edge member a minimum of 16 inches (406 mm) from the edge. Blocking shall have end connections with a minimum of six (6) – 16d common nails. Floor sheathing shall be continuous for a minimum of 24 inches (610 mm) from the edge and shall be fastened to each roll brace with a minimum of twelve (12) – 10d common nails and shall be fastened to the edge member with a minimum of twelve (12) – 10d common nails within 12 inches (305 mm) of the roll brace.

 

Original Code Change and Drawings

Engineering Calculations

Torsion Calculations

Rotation Calculations

Engineering Drawings

Floor Edge Bracing Details

Floor Framing Supporting Guards (8638)

IRC: R502.11 (New), R502.11.1 (New), 502.11.2 (New), 502.11.3 (New)

Proponents:  David Cooper, representing Stairbuilders and Manufacturers Association (coderep@stairways.org)

Add new text as follows:
R502.11 Floor framing supporting guards..  The framing at the open edge of a floor supporting a required guard assembly not exceeding 44 in. (1118 mm) in height shall be constructed in accordance with R502.11.1 or R502.11.2 or shall be designed in accordance with accepted engineering practice to support the guard assembly. Trusses and I-joists are prohibited as edge framing members supporting guards except where the effects of the guard loads are specifically considered in the design of the edge member.

R502.11.1 Conventional edge framing.. The framing at the edge of the floor shall consist of a solid or built-up wood member having a minimum net width of 3 inches (76mm) and a minimum net depth of 9-1/4 in. (235 mm) and shall be braced to resist rotation by roll bracing as described in 502.11.3 with a roll brace aligned with each guard post.

502.11.2 Timber edge framing.. The framing at the edge of the floor shall consist of a minimum 6×10 sawn timber or a minimum 5-1/8 in. x 9-1/4 in. (130 mm x 235 mm) glued laminated timber and shall be braced to resist rotation by roll bracing as described in 502.11.3 at intervals of 48 in. (1219 mm) or less.

502.11.3 Roll bracing.. Each roll brace shall be a joist or blocking matching the depth of the edge member and extending perpendicular to the edge member a minimum of 16 in. from the edge. Blocking shall have end connections with a minimum of six (6) – 16d common nails. Floor sheathing shall be continuous for a minimum of 24 in (610 mm) from the edge and shall be fastened to each roll brace with a minimum of twelve (12) – 10d common nails and shall be fastened to the edge member with a minimum of twelve (12) – 10d common nails within 12 inches (305 mm) of the roll brace.

Reason: The Problem:
Guards are required to transfer the outward and downward loads applied at the top of the guard to the structure. If the structure fails, the guard cannot perform its defined function to minimize the possibility of a fall. Many floor systems (both conventional and engineered) are not being designed and constructed to resist guard loads at the edge of walking surfaces where guards are required. Manufacturers and designers of  engineered floor systems (e.g., trusses and I-joists) and plan reviewers are commonly unaware of guard attachment  requirements and do not ensure that framing is adequate to support guards. Inadequate framing is commonly encountered with costly reinforcement (and possibly redesign) needed at the time of guard installation. In current practice where inadequate framing is encountered, flooring or ceilings are ripped out to install blocking to harden the edge beam for attachment of the guard. Such fixes are not engineered and, in many cases, occur after the rough inspection. The problem will persist unless a solution can be codified.

A Collaborative Formed:
The SMA surveyed our membership and found the problem to be chronic across the nation and assembled a task group representing manufacturers of, trusses, I- joists, framing and post connection hardware, and guard components as well as, home builders, guard fabricators, guard installers, stairbuilders, and others from industry at large, some 18  participants in all. About half of the team are engineers, and about half have extensive involvement in code and standard development. Meeting biweekly since early fall of 2021 this team has worked together to develop consensus upon an engineered solution presented here with two prescriptive options suitable for inclusion in the 2024 IRC.

A Prescriptive Solution:
By recommendation of the manufacturers of I-joists and trusses and consensus of the entire task group this proposal prohibits the use of I-joists and trusses as edge framing members supporting guards except where the effects of the guard loads are specifically considered in the design of the edge member. This is based upon the limited embedment of fasteners in the thickness of the joist and truss materials, open areas/voids, and surfaces where fasteners cannot be used that would weaken the component or connections between the truss/I-joist components.
Both top mount and side mount guards are suitable provided there is sufficient material to engage threaded fasteners and the edge beam/joist is not subject to rotation or torsion. Based upon calculation of the loads transferred to the structure from the top of the guard, two options are provided. (Calculations may be reviewed at the link below.)

R502.11.1 Conventional edge framing, describes the minimal thickness to resist withdrawal of fasteners and height of the edge beam/joist as that of a common double 2 x 10. Blocking/roll bracing is aligned with the post locations to resist rotation and eliminate torsion induced by guard loads.

R502.11.2 Timber edge framing, provides specifications to allow use of a thicker timber or glulam which is sized to resist torsion allowing roll bracing to be spaced at a maximum distance of 48 inches on center to alleviate the need for precise alignment of the post with the roll bracing or a joist. Although the minimum guard height in the IRC is 36 inches it is not unusual that portions of the guard, post caps, or finials extend above the guard height. We agreed that a height of 44 inches would be reasonably conservative to use for the purpose of calculating the edge beam size and roll bracing requirements. To restrict outward movement of the top of the edge beam, specific nailing of the floor sheathing is called out at the location of roll bracing. Floor sheathing must be continuous for a minimum distance from the open edge to assure the structural integrity of the bracing and edge beam. The nailing requirements for attachment of the blocking used as roll bracing to the joists prevents uplift of the blocking, and the minimum length allows it to fit into one joist bay where joist spacing is taken from the open edge of the edge beam. These details are specified in R502.11.3 Roll Bracing.

This proposal has been clearly and carefully constructed to be understood and enforced without figures referenced in the code text. We have included drawings to aid understanding among the many proposals to be considered in this cycle. The drawings submitted would however be suitable for inclusion in the commentary.

Engineering Calculations supporting this proposal can be found on this page.  https://stairways.org/redesign2026/guard-calculations/.

PLEASE SEE DRAWINGS HERE. 

Cost Impact: The code change proposal will decrease the cost of construction.  This proposal will decrease the cost of construction due to the elimination of necessary after-the-fact demolition and repair to install blocking at each post location. An average job with guards has three or more posts with 1 to 2 hours each for blocking plus repairs to finish surfaces estimated at approximately $400 – $800 in extra charges per 3 post job. This does not include any engineering fees if applicable.

Stair Safety Education is critical to reducing the most common causes of all stairway accidents affecting the entire family.

Created by a team of educational and industry professionals this classroom tested program provides a needed emphasis and tools for results that will affect the way entire families “Use Stairs Safely”.

2021 International Residential Code

Add new text as follows:
R502.11 Floor framing supporting guards..  The framing at the open edge of a floor supporting a required guard assembly not exceeding 44 in.
(1118 mm) in height shall be constructed in accordance with R502.11.1 or R502.11.2 or shall be designed in accordance with accepted engineering practice to support the guard assembly. Trusses and I-joists are prohibited as edge framing members supporting guards except where the effects of the guard loads are specifically considered in the design of the edge member.

R502.11.1 Conventional edge framing.. The framing at the edge of the floor shall consist of a solid or built-up wood member having a minimum net width of 3 inches (76mm) and a minimum net depth of 9-1/4 in. (235 mm) and shall be braced to resist rotation by roll bracing as described in 502.11.3 with a roll brace aligned with each guard post.

502.11.2 Timber edge framing.. The framing at the edge of the floor shall consist of a minimum 6×10 sawn timber or a minimum 5-1/8 in. x 9-1/4 in. (130 mm x 235 mm) glued laminated timber and shall be braced to resist rotation by roll bracing as described in 502.11.3 at intervals of 48 in. (1219 mm) or less.

502.11.3 Roll bracing.. Each roll brace shall be a joist or blocking matching the depth of the edge member and extending perpendicular to the edge member a minimum of 16 in. from the edge. Blocking shall have end connections with a minimum of six (6) – 16d common nails. Floor sheathing shall be continuous for a minimum of 24 in (610 mm) from the edge and shall be fastened to each roll brace with a minimum of twelve (12) – 10d common nails and shall be fastened to the edge member with a minimum of twelve (12) – 10d common nails within 12 inches (305 mm) of the roll brace.

Reason: The Problem:
Guards are required to transfer the outward and downward loads applied at the top of the guard to the structure. If the structure fails, the guard cannot perform its defined function to minimize the possibility of a fall. Many floor systems (both conventional and engineered) are not being designed and constructed to resist guard loads at the edge of walking surfaces where guards are required. Manufacturers and designers of  engineered floor systems (e.g., trusses and I-joists) and plan reviewers are commonly unaware of guard attachment  requirements and do not ensure that framing is adequate to support guards. Inadequate framing is commonly encountered with costly reinforcement (and possibly redesign) needed at the time of guard installation. In current practice where inadequate framing is encountered, flooring or ceilings are ripped out to install blocking to harden the edge beam for attachment of the guard. Such fixes are not engineered and, in many cases, occur after the rough inspection. The problem will persist unless a solution can be codified.

A Collaborative Formed:
The SMA surveyed our membership and found the problem to be chronic across the nation and assembled a task group representing manufacturers of, trusses, I- joists, framing and post connection hardware, and guard components as well as, home builders, guard fabricators,
guard installers, stairbuilders, and others from industry at large, some 18  participants in all. About half of the team are engineers, and about half have extensive involvement in code and standard development. Meeting biweekly since early fall of 2021 this team has worked together to develop consensus upon an engineered solution presented here with two prescriptive options suitable for inclusion in the 2024 IRC.

A Prescriptive Solution:
By recommendation of the manufacturers of I-joists and trusses and consensus of the entire task group this proposal prohibits the use of I-joists and trusses as edge framing members supporting guards except where the effects of the guard loads are specifically considered in the design of
the edge member. This is based upon the limited embedment of fasteners in the thickness of the joist and truss materials, open areas/voids, and surfaces where fasteners cannot be used that would weaken the component or connections between the truss/I-joist components.
Both top mount and side mount guards are suitable provided there is sufficient material to engage threaded fasteners and the edge beam/joist is not subject to rotation or torsion. Based upon calculation of the loads transferred to the structure from the top of the guard, two options are provided. (Calculations may be reviewed at the link below.)

R502.11.1 Conventional edge framing, describes the minimal thickness to resist withdrawal of fasteners and height of the edge beam/joist as that
of a common double 2 x 10. Blocking/roll bracing is aligned with the post locations to resist rotation and eliminate torsion induced by guard loads.

R502.11.2 Timber edge framing, provides specifications to allow use of a thicker timber or glulam which is sized to resist torsion allowing roll bracing to be spaced at a maximum distance of 48 inches on center to alleviate the need for precise alignment of the post with the roll bracing or a joist. Although the minimum guard height in the IRC is 36 inches it is not unusual that portions of the guard, post caps, or finials extend above the guard height. We agreed that a height of 44 inches would be reasonably conservative to use for the purpose of calculating the edge beam size and roll bracing requirements. To restrict outward movement of the top of the edge beam, specific nailing of the floor sheathing is called out at the location of roll bracing. Floor sheathing must be continuous for a minimum distance from the open edge to assure the structural integrity of the bracing and edge beam. The nailing requirements for attachment of the blocking used as roll bracing to the joists prevents uplift of the blocking, and the minimum length allows it to fit into one joist bay where joist spacing is taken from the open edge of the edge beam. These details are specified in R502.11.3 Roll Bracing.

This proposal has been clearly and carefully constructed to be understood and enforced without figures referenced in the code text. We have
included drawings to aid understanding among the many proposals to be considered in this cycle. The drawings submitted would however be
suitable for inclusion in the commentary.

Engineering Calculations supporting this proposal can be found at this link: <SMA to provide link for Staff to insert>

<Note to staff: Insert attached 3 pages of drawings here>

Cost Impact: The code change proposal will decrease the cost of construction.  This proposal will decrease the cost of construction due to the elimination of necessary after-the-fact demolition and repair to install blocking at each post location. An average job with guards has three or more posts with 1 to 2 hours each for blocking plus repairs to finish surfaces estimated at approximately $400 – $800 in extra charges per 3 post job. This does not include any engineering fees if applicable.

Subscribe to SMA Emails.

Keep up to date with all of the latest code changes and design inspirations. No membership required.

Become a Member.

Membership in the SMA is an invaluable resource that allows stair industry professionals of every type to advance their careers through networking, engaging in continuing education, keeping up with changes within the industry, and accessing new products.